Synopses & Papers
Synopses of papers may be reviewed below by clicking upon the link under the paper title
Full papers will be made available online for those users who register to attend the conference, and in hard copy at the conference.
Back to topLegislation and Policy
![]() |
|
![]() ![]() |
1.1 Reservoir Safety - What do we mean? |
![]() ![]() |
1.2 Proposed reservoir safety legislation for Northern Ireland |
![]() ![]() |
1.3 Statutory reservoirs - matters of opinion |
![]() ![]() |
1.4 Potential changes to hazard categorisation and inflow design floods for reservoirs in the United Kingdom |
![]() ![]() |
1.5 Implementing Severn Trent Waters People Plan to become the best in Great Britain |
Back to topGeotechnical
![]() |
|
![]() ![]() |
2.1 Monitoring embankment performance during the raising of Abberton Reservoir |
![]() ![]() |
2.2. Some Aspects of Embankment Dams Constructed on the Mercia Mudstone |
![]() ![]() |
2.3 Gleann Astaile Dam - Design and Construction of a Geomembrane Lined Embankment Dam |
![]() ![]() |
2.4 Recent Improvements in Predicting Breach through Flood Embankments |
![]() ![]() |
2.5 Behaviuor of Embankment Dams in Earthquakes |
![]() ![]() |
2.6 Numerical Analysis of the Seismic Response of La Villita Dam in Mexico |
![]() ![]() |
2.7 Applying Available Internal Erosion Criteria to Dams with Cores of Glacial Till - A Reassessment of a 1980s Sinkhole |
![]() ![]() |
2.8 Thermal Deformation of Concrete Dams - Justification, Clarification and Improvement of Statistical Analysis |
Back to topRisk
![]() |
|
![]() ![]() |
3.1 Reservoir Safety Risk Assessment - A New Guide |
![]() ![]() |
3.2 Observations on the Boundary Between High and Lower Risk Reservoirs |
![]() ![]() |
3.3 Flood Contingency Planning During Construction on Reservoir Embankments |
![]() |
3.4 Pebley Reservoir (Derbyshire) Emergency Drawdown Exercise Author(s): Windsor View Synopsis |
![]() ![]() |
3.5 Exploring the Potential Use of a Risk-Based Approach to Assessing the Geotechnical Well-Being of the Slopes of Old Embankment Dams |
![]() ![]() |
3.6 A Pragmatic Approach to Portfolio Risk Assessment at Severn Trent Water |
![]() ![]() |
3.7 A Guide to the Effects of Climate Change in Dams |
![]() ![]() |
3.8 The Effect of Selected Climate Change Scenarios on Engineering Risk Associated with Slope Stability of Embankment Dams |
![]() ![]() |
3.9 Current European Research Relevant to Reservoir Safety The FloodProBE and UrbanFlood Projects |
Back to topConstruction 1
![]() |
|
![]() ![]() |
4.1 Tackling the Thorny Issue of Spillway Capacity in Yorkshire |
![]() ![]() |
4.2 The Reservoirs of the Holme Valley |
![]() ![]() |
4.3 Physical Testing of a Stepped Masonry Spillway |
![]() ![]() |
4.4 Precast Concrete in Reservoir Engineering |
![]() ![]() |
4.5 Braid Burn Flood Storage Reservoirs |
![]() ![]() |
4.6 Discontinuance of Small Reservoirs |
Back to topEnvironmental
![]() |
|
![]() ![]() |
5.1 Environment Integral to Flood Detention Dams on the River Mole |
![]() ![]() |
5.2 Mill Beck - A Lesson in Reservoir Safety Works Aligned with Public Engagement and a Participatory Design Process |
![]() ![]() |
5.3 The Discontinuance of Baystone Bank Reservoir and Restoration of Whicham Beck |
![]() ![]() |
5.4 Grouting of Badger Setts in a Flood Storage Reservoir Embankment |
![]() ![]() |
5.5 Environmental and social impacts of dams in India |
![]() ![]() |
5.6 Beavers and the Crinan Canal Reservoirs |
![]() ![]() |
5.7 The Impact of the “New FEH” Depth-Duration Frequency Curves on Extreme Floods for the Nant-y-Moch |
Back to topConstruction 2
![]() |
|
![]() ![]() |
6.1 The Hull Tidal Surge Barrier Refurbishment Project |
![]() ![]() |
6.2 Physical and CFD Modelling of a Labyrinth Spillway for Penwhirn Reservoir |
![]() ![]() |
6.3 Coldwell Lower Reservoir - Weighted Filter, Wave Wall and Overflow Improvements |
![]() ![]() |
6.4 The Design and Construction of Kargu Dam |
![]() ![]() |
6.5 The Design and Construction of Banbury Flood Storage Reservoir |
![]() ![]() |
6.6 Improving Anglian Water’s Emergency Response for Reservoir Safety |
Back to topIncidents
![]() |
|
![]() ![]() |
7.1 Remedial grouting works at Upper Rivington Reservoir |
![]() ![]() |
7.2 Recent Incidents at Canal Reservoirs |
![]() ![]() |
7.3 Remedial Works at Sunderton Pool |
![]() ![]() |
7.4 Restoring Storage Capacity at Roseau Reservoir Following Hurricane Tomas |