Synopses & Papers
Full papers are available by clicking on the paper titles below.
Synopses of these papers are also available.
Back to topLegislation and Policy
![]() |
|
![]() ![]() |
1.1 Reservoir Safety - What do we mean? |
![]() ![]() |
1.2 Proposed reservoir safety legislation for Northern Ireland |
![]() ![]() |
1.3 Statutory reservoirs - matters of opinion |
![]() ![]() |
1.4 Potential changes to hazard categorisation and inflow design floods for reservoirs in the United Kingdom |
![]() ![]() |
1.5 Implementing Severn Trent Waters People Plan to become the best in Great Britain |
Back to top Geotechnical
![]() |
|
![]() ![]() |
2.1 Monitoring embankment performance during the raising of Abberton Reservoir |
![]() ![]() |
2.2. Some Aspects of Embankment Dams Constructed on the Mercia Mudstone |
![]() ![]() |
2.3 Gleann Astaile Dam - Design and Construction of a Geomembrane Lined Embankment Dam |
![]() ![]() |
2.4 Recent Improvements in Predicting Breach through Flood Embankments |
![]() ![]() |
2.5 Behaviuor of Embankment Dams in Earthquakes |
![]() ![]() |
2.6 Numerical Analysis of the Seismic Response of La Villita Dam in Mexico |
![]() ![]() |
2.7 Applying Available Internal Erosion Criteria to Dams with Cores of Glacial Till - A Reassessment of a 1980s Sinkhole |
![]() ![]() |
2.8 Thermal Deformation of Concrete Dams - Justification, Clarification and Improvement of Statistical Analysis |
Back to topRisk
Back to topConstruction 1
![]() |
|
![]() ![]() |
4.1 Tackling the Thorny Issue of Spillway Capacity in Yorkshire |
![]() ![]() |
4.2 The Reservoirs of the Holme Valley |
![]() ![]() |
4.3 Physical Testing of a Stepped Masonry Spillway |
![]() ![]() |
4.4 Precast Concrete in Reservoir Engineering |
![]() ![]() |
4.5 Braid Burn Flood Storage Reservoirs |
![]() ![]() |
4.6 Discontinuance of Small Reservoirs |
Back to topEnvironmental
![]() |
|
![]() ![]() |
5.1 Environment Integral to Flood Detention Dams on the River Mole |
![]() ![]() |
5.2 Mill Beck - A Lesson in Reservoir Safety Works Aligned with Public Engagement and a Participatory Design Process |
![]() ![]() |
5.3 The Discontinuance of Baystone Bank Reservoir and Restoration of Whicham Beck |
![]() ![]() |
5.4 Grouting of Badger Setts in a Flood Storage Reservoir Embankment |
![]() ![]() |
5.5 Environmental and social impacts of dams in India |
![]() ![]() |
5.6 Beavers and the Crinan Canal Reservoirs |
![]() ![]() |
5.7 The Impact of the “New FEH” Depth-Duration Frequency Curves on Extreme Floods for the Nant-y-Moch in mid Wales |
Back to topConstruction 2
![]() |
|
![]() ![]() |
6.1 The Hull Tidal Surge Barrier Refurbishment Project |
![]() ![]() |
6.2 Physical and CFD Modelling of a Labyrinth Spillway for Penwhirn Reservoir |
![]() ![]() |
6.3 Coldwell Lower Reservoir - Weighted Filter, Wave Wall and Overflow Improvements |
![]() ![]() |
6.4 The Design and Construction of Kargu Dam |
![]() ![]() |
6.5 The Design and Construction of Banbury Flood Storage Reservoir |
![]() ![]() |
6.6 Improving Anglian Water’s Emergency Response for Reservoir Safety |
Back to topIncidents
![]() |
|
![]() ![]() |
7.1 Remedial grouting works at Upper Rivington Reservoir |
![]() ![]() |
7.2 Recent Incidents at Canal Reservoirs |
![]() ![]() |
7.3 Remedial Works at Sunderton Pool |
![]() ![]() |
7.4 Restoring Storage Capacity at Roseau Reservoir Following Hurricane Tomas |